Parking on this road is extremely difficult for local residents -a permit scheme is a possible solution to partially eleviate this ongoing congestion problem.
As construction equipment will be on-site during the resurfacing, surely it would be good sense financially to progress with this scheme at the same time.
This ePetition ran from 02/02/2021 to 01/08/2021 and has now finished.
59 people signed this ePetition.